Picture Window Replacement

At ACE House Painting we have found through experience that a systematic process helps us to deliver the quality job you expect.

 

Outlined below are the steps we will take on your project.  Your situation may vary depending upon your needs as outlined on your Proposal. 

 

  • Step 1: Damaged Area Review
    All windows and wood to be removed and replaced are reviewed with the on-site crew as per the project proposal.
  • Step 2: Surface Preparation
    All rotted, unsuitable wood and glass is removed taking care not to damage areas that are structurally sound. Replacement wood and glass is measured and accurately fitted for each new piece.  All seams, nail holes, and gaps are caulked to prevent water intrusion.
  • Step 3: Primer
    Primer is applied to all exposed wood surfaces to ensure paint adhesion and preserve the wood.
  • Step 4: Paint
    Premium quality Sherwin Williams paint is applied with an airless sprayer which allows us to apply the recommended paint thickness on all surfaces. Where necessary some areas are brushed and/or back-rolled for a smooth uniform finish.
  • Step 5: Clean
    Clean up is done daily, as well as at the completion of our work.  All our materials are packed up and stored neatly.  All trash is removed at completion of the project.
  • Step 6: Inspect
    After our own inspection, we will perform a joint inspection of our work with you.  Upon your satisfaction, final payment is received.